The main body of the filter press equipment is lifted and transported to the site

After the on-site equipment foundation is completed, the main equipment enters the site and is installed in place.




 

The main body of the filter press is positioned on the concrete foundation,

Install other supporting facilities such as mud storage hopper, filter plate, filter cloth, circuit, pipeline, valve, etc. (at this time, the factory building has not yet been capped, and large equipment is usually topped up with advanced equipment to facilitate equipment lifting)




 

After the factory building is capped, all equipment accessories are installed in place one by one

At this time, the debugging and trial operation of the water and electricity circuit can be carried out!

For the construction and installation of pump valve pipelines, for project and engineering projects (general contracting projects), our company will provide a complete set of project drawings, including but not limited to project PID drawings, equipment external dimension drawings, valve lists, pipeline drawings, etc.



Equipment in place, accessories in place, debugging completed, project delivered perfectly!

-->